WandaWoman Knits: Adventures in Knitting and Life

My forays into knitting, the highs and the lows and anything in between

Archive for April, 2005

Might Just Be A Little Crazy

Posted by awanda on April 28, 2005

But I suppose that’s nothing new to those that know me. It’s funny so many people that have said my summer knitting lineup is ambitious. I dunno, I guess it is ambitious. Since I am no longer working a second job and I don’t have any children, save my dbf, I do have plenty of time to knit, in between doing other things like visiting with friends, domestic stuff, etc. I do realize some of it may not get done, but seeing it in a list gives me a purpose and helps me focus in on what I would like to accomplish.

Oh, so then I looked at my summer knitting lineup post again and realized that 2 of the items I will be carrying with me to NY and will get lots of knitting done there. And of the 7 I have listed, 2 others one only require a back or less than that to be finished. I also have a hair appointment on Tuesday night, so that should be 3-4 hours of knitting time right there. Most of you can’t help but know that I have locks. I go to a consultant that retightens my hair, whenever I go to get it done. Typically that should be 8-10 weeks, sometimes it’s longer. Nonetheless, my hair is so thick, it usually takes my consultant at least 3.5 hours to 4.5 hours, just depends. I always love when I go to get my hair retightened, because I get to visit with a good friend and I get lots of knitting done! I plan on taking the red-orange tank in with me to finish up that back. It shouldn’t take me too long and there’s a good possibility that I will be done by that evening. I think I will look at the pattern again this weekend to see where I left off and work a few rows to get in the groove and then be ready to finish it on Tuesday evening!

How bad is that I know I’m going out of town next Thursday and should be thinking of things to pack and all I can think of is what knitting projects to take? I still have to make a nursing shawl for my sister. I’m planning on taking that with me while we travel. I might be making a pit stop in Atlanta on the way back since we will be flying back through Atlanta and we have buddy passes, so hopefully my little nephew Chason would have made his way into the world by that time. If not, I will still get to see my baby sister pregnant, which is funny and so cute to me all at the same time.

Okay, I guess enough with the running on. Knitting-wise (although I guess this is all about knitting anyway), I’ve been working right along, but only on Donna. I put Tempting down on Sunday and haven’t picked it up since. I believe I shall have a knitting fest again this Sunday since the bf will be out-of-town this Friday. I can sit at home, watch a couple of chick flicks and knit till my heart’s content. I have been cruising away on Donna. I decided that I like most of my sweaters at the length of 23″, as I measured one of my favorite sweaters and that’s the perfect length. Since Donna calls for a finished length of 25″ and raglan shaping begins once you hit 16″, I will work in pattern until 14″ and then begin shaping. I expect I will have the back finished before I leave for NYC. Since I’m not sure where I want the bust darts to happen, I will probably do the sleeves while I’m in NYC and start the body, but we will see how that goes. I may just have the sleeves done and that’s it, who knows? Boy, just reading this makes me feel like I have deadlines for everything! Not really, but I just think I can be this far by this date, but there is no deadline for any of this, other than to finish something.

Hmm, still rambling on and just going off on a tangent, I guess this is what happens when I talk to people in regular life too! Kind of sad (I feel bad for the others!), but oh well. All of that above to say I’ve been cruisin’ on Donna and she’s at about 9.5 inches now. So I will only 4.5 inches more to begin shaping. Might not get much knitting in tonight as I must clean and straighten to have my knittin’ buds over Friday night.

I also joined a couple of knit-alongs, if you check the buttons on the sidebar, I found the 2005 Knitalongs site somewhere and found there was a Summer KAL which is for any summer pattern. I am so there, since there are so many I want to work on this summer. And I also joined theCurvaceous Tempting KAL. Look at me, I’m a joiner! But it was easy since I was already doing them anyway. I thought about joining the Triada-along, but I will probably pass as I’m not ready to start yet and I found a Xback KAL(from the Knitty pattern of the same name), but opted not to do that one at this point.

I did decide that I will probably not get the seed/moss st tank out of Reynolds Saucy done this summer. I want to finish Donna and Tempting and another one of my other fun summer patterns, so I can get started on the Cabled Tennis Sweater. I need to get one of my projects I just started out of the way before I get started on it. If I don’t, I will truly have the start-itis problem out-of-control. I’m good if I have 3-4 projects going, but anymore than that, I’m just out-of-control and we certainly can’t have that!

No new knitty pics, hopefully after tomorrow evening, I’ll have some pics. But after that, it will sparse here for awhile as my bf will have the digital camera with him in NYC until I join him next Thursday. Still undecided if I should be a total dork and take my laptop with me . .

Posted in Uncategorized | Leave a Comment »

Might Just Be A Little Crazy

Posted by awanda on April 28, 2005

But I suppose that’s nothing new to those that know me. It’s funny so many people that have said my summer knitting lineup is ambitious. I dunno, I guess it is ambitious. Since I am no longer working a second job and I don’t have any children, save my dbf, I do have plenty of time to knit, in between doing other things like visiting with friends, domestic stuff, etc. I do realize some of it may not get done, but seeing it in a list gives me a purpose and helps me focus in on what I would like to accomplish.

Oh, so then I looked at my summer knitting lineup post again and realized that 2 of the items I will be carrying with me to NY and will get lots of knitting done there. And of the 7 I have listed, 2 others one only require a back or less than that to be finished. I also have a hair appointment on Tuesday night, so that should be 3-4 hours of knitting time right there. Most of you can’t help but know that I have locks. I go to a consultant that retightens my hair, whenever I go to get it done. Typically that should be 8-10 weeks, sometimes it’s longer. Nonetheless, my hair is so thick, it usually takes my consultant at least 3.5 hours to 4.5 hours, just depends. I always love when I go to get my hair retightened, because I get to visit with a good friend and I get lots of knitting done! I plan on taking the red-orange tank in with me to finish up that back. It shouldn’t take me too long and there’s a good possibility that I will be done by that evening. I think I will look at the pattern again this weekend to see where I left off and work a few rows to get in the groove and then be ready to finish it on Tuesday evening!

How bad is that I know I’m going out of town next Thursday and should be thinking of things to pack and all I can think of is what knitting projects to take? I still have to make a nursing shawl for my sister. I’m planning on taking that with me while we travel. I might be making a pit stop in Atlanta on the way back since we will be flying back through Atlanta and we have buddy passes, so hopefully my little nephew Chason would have made his way into the world by that time. If not, I will still get to see my baby sister pregnant, which is funny and so cute to me all at the same time.

Okay, I guess enough with the running on. Knitting-wise (although I guess this is all about knitting anyway), I’ve been working right along, but only on Donna. I put Tempting down on Sunday and haven’t picked it up since. I believe I shall have a knitting fest again this Sunday since the bf will be out-of-town this Friday. I can sit at home, watch a couple of chick flicks and knit till my heart’s content. I have been cruising away on Donna. I decided that I like most of my sweaters at the length of 23″, as I measured one of my favorite sweaters and that’s the perfect length. Since Donna calls for a finished length of 25″ and raglan shaping begins once you hit 16″, I will work in pattern until 14″ and then begin shaping. I expect I will have the back finished before I leave for NYC. Since I’m not sure where I want the bust darts to happen, I will probably do the sleeves while I’m in NYC and start the body, but we will see how that goes. I may just have the sleeves done and that’s it, who knows? Boy, just reading this makes me feel like I have deadlines for everything! Not really, but I just think I can be this far by this date, but there is no deadline for any of this, other than to finish something.

Hmm, still rambling on and just going off on a tangent, I guess this is what happens when I talk to people in regular life too! Kind of sad (I feel bad for the others!), but oh well. All of that above to say I’ve been cruisin’ on Donna and she’s at about 9.5 inches now. So I will only 4.5 inches more to begin shaping. Might not get much knitting in tonight as I must clean and straighten to have my knittin’ buds over Friday night.

I also joined a couple of knit-alongs, if you check the buttons on the sidebar, I found the 2005 Knitalongs site somewhere and found there was a Summer KAL which is for any summer pattern. I am so there, since there are so many I want to work on this summer. And I also joined theCurvaceous Tempting KAL. Look at me, I’m a joiner! But it was easy since I was already doing them anyway. I thought about joining the Triada-along, but I will probably pass as I’m not ready to start yet and I found a Xback KAL(from the Knitty pattern of the same name), but opted not to do that one at this point.

I did decide that I will probably not get the seed/moss st tank out of Reynolds Saucy done this summer. I want to finish Donna and Tempting and another one of my other fun summer patterns, so I can get started on the Cabled Tennis Sweater. I need to get one of my projects I just started out of the way before I get started on it. If I don’t, I will truly have the start-itis problem out-of-control. I’m good if I have 3-4 projects going, but anymore than that, I’m just out-of-control and we certainly can’t have that!

No new knitty pics, hopefully after tomorrow evening, I’ll have some pics. But after that, it will sparse here for awhile as my bf will have the digital camera with him in NYC until I join him next Thursday. Still undecided if I should be a total dork and take my laptop with me . .

Posted in Uncategorized | Leave a Comment »

Might Just Be A Little Crazy

Posted by awanda on April 28, 2005

But I suppose that’s nothing new to those that know me. It’s funny so many people that have said my summer knitting lineup is ambitious. I dunno, I guess it is ambitious. Since I am no longer working a second job and I don’t have any children, save my dbf, I do have plenty of time to knit, in between doing other things like visiting with friends, domestic stuff, etc. I do realize some of it may not get done, but seeing it in a list gives me a purpose and helps me focus in on what I would like to accomplish.

Oh, so then I looked at my summer knitting lineup post again and realized that 2 of the items I will be carrying with me to NY and will get lots of knitting done there. And of the 7 I have listed, 2 others one only require a back or less than that to be finished. I also have a hair appointment on Tuesday night, so that should be 3-4 hours of knitting time right there. Most of you can’t help but know that I have locks. I go to a consultant that retightens my hair, whenever I go to get it done. Typically that should be 8-10 weeks, sometimes it’s longer. Nonetheless, my hair is so thick, it usually takes my consultant at least 3.5 hours to 4.5 hours, just depends. I always love when I go to get my hair retightened, because I get to visit with a good friend and I get lots of knitting done! I plan on taking the red-orange tank in with me to finish up that back. It shouldn’t take me too long and there’s a good possibility that I will be done by that evening. I think I will look at the pattern again this weekend to see where I left off and work a few rows to get in the groove and then be ready to finish it on Tuesday evening!

How bad is that I know I’m going out of town next Thursday and should be thinking of things to pack and all I can think of is what knitting projects to take? I still have to make a nursing shawl for my sister. I’m planning on taking that with me while we travel. I might be making a pit stop in Atlanta on the way back since we will be flying back through Atlanta and we have buddy passes, so hopefully my little nephew Chason would have made his way into the world by that time. If not, I will still get to see my baby sister pregnant, which is funny and so cute to me all at the same time.

Okay, I guess enough with the running on. Knitting-wise (although I guess this is all about knitting anyway), I’ve been working right along, but only on Donna. I put Tempting down on Sunday and haven’t picked it up since. I believe I shall have a knitting fest again this Sunday since the bf will be out-of-town this Friday. I can sit at home, watch a couple of chick flicks and knit till my heart’s content. I have been cruising away on Donna. I decided that I like most of my sweaters at the length of 23″, as I measured one of my favorite sweaters and that’s the perfect length. Since Donna calls for a finished length of 25″ and raglan shaping begins once you hit 16″, I will work in pattern until 14″ and then begin shaping. I expect I will have the back finished before I leave for NYC. Since I’m not sure where I want the bust darts to happen, I will probably do the sleeves while I’m in NYC and start the body, but we will see how that goes. I may just have the sleeves done and that’s it, who knows? Boy, just reading this makes me feel like I have deadlines for everything! Not really, but I just think I can be this far by this date, but there is no deadline for any of this, other than to finish something.

Hmm, still rambling on and just going off on a tangent, I guess this is what happens when I talk to people in regular life too! Kind of sad (I feel bad for the others!), but oh well. All of that above to say I’ve been cruisin’ on Donna and she’s at about 9.5 inches now. So I will only 4.5 inches more to begin shaping. Might not get much knitting in tonight as I must clean and straighten to have my knittin’ buds over Friday night.

I also joined a couple of knit-alongs, if you check the buttons on the sidebar, I found the 2005 Knitalongs site somewhere and found there was a Summer KAL which is for any summer pattern. I am so there, since there are so many I want to work on this summer. And I also joined theCurvaceous Tempting KAL. Look at me, I’m a joiner! But it was easy since I was already doing them anyway. I thought about joining the Triada-along, but I will probably pass as I’m not ready to start yet and I found a Xback KAL(from the Knitty pattern of the same name), but opted not to do that one at this point.

I did decide that I will probably not get the seed/moss st tank out of Reynolds Saucy done this summer. I want to finish Donna and Tempting and another one of my other fun summer patterns, so I can get started on the Cabled Tennis Sweater. I need to get one of my projects I just started out of the way before I get started on it. If I don’t, I will truly have the start-itis problem out-of-control. I’m good if I have 3-4 projects going, but anymore than that, I’m just out-of-control and we certainly can’t have that!

No new knitty pics, hopefully after tomorrow evening, I’ll have some pics. But after that, it will sparse here for awhile as my bf will have the digital camera with him in NYC until I join him next Thursday. Still undecided if I should be a total dork and take my laptop with me . .

Posted in Uncategorized | Leave a Comment »

What a Weekend

Posted by awanda on April 25, 2005

I always have great ideas that I will blog on the weekends, but the reality is, that has yet to happen. Blogging sometimes feels like a job. While I enjoy it M-F, on the weekends, I usually just don’t want to.

Anyhow, this weekend, had lots of fun with my knitting girls, Stacey, Michelle, and Cynthia. Stacey organized a beading outing where we hit Bead It! We picked out beads (which could be a dangerous hobby) and made stitch markers right there in the store. Thank goodness, because if I had to take them home, I would’ve spent a ton. Michelle made a few, but took home some beads too. Stacey actually brought some of her beads, made a couple of stitch markers and then broke out her serious bead collection and pulled out some very cute beads and made a necklace. See the layout of beads to be a symmetrical necklace:
Posted by Hello

and then the finished product, as modeled by the lovely Stacey . .
Posted by Hello

Miss Cynthia also made quite a few beaded stitch markers, here’s but a few:
Posted by Hello

and I made just a few and a pair of earrings, which are so cute!
Posted by Hello

After having lunch and then hitting Joann’s in search of some Cotton-Ease (since it is being discontinued), which Stacey and Cynthia had too much fun shopping. I made it out with no Cotton-Ease(darn it all!), but a pair of collapsible scissors, which hopefully I will have enough sense to not bring on my carry-on this time!

Sunday was spent lazing about watching lots of movies, Hotel Rwanda, great movie, but oh so sad, but very life-affirming. Meet the Fockers, so-so on the humor, but was nevertheless entertaining and later on, a re-viewing of Sideways, which I just adore. And I made lots of progress on Donna and Tempting, see:

Posted by Hello

and Tempting here:
Posted by Hello

As my bf says, I was knitting most of the days, a good 10-12 hours and knitting exclusively on these two items. I was quite happy with the progress. Today, I may work on turning the heel on my almost-forgotten sock, then I can work on that one in public again.

That is all for now . .

Posted in Uncategorized | Leave a Comment »

What a Weekend

Posted by awanda on April 25, 2005

I always have great ideas that I will blog on the weekends, but the reality is, that has yet to happen. Blogging sometimes feels like a job. While I enjoy it M-F, on the weekends, I usually just don’t want to.

Anyhow, this weekend, had lots of fun with my knitting girls, Stacey, Michelle, and Cynthia. Stacey organized a beading outing where we hit Bead It! We picked out beads (which could be a dangerous hobby) and made stitch markers right there in the store. Thank goodness, because if I had to take them home, I would’ve spent a ton. Michelle made a few, but took home some beads too. Stacey actually brought some of her beads, made a couple of stitch markers and then broke out her serious bead collection and pulled out some very cute beads and made a necklace. See the layout of beads to be a symmetrical necklace:
Posted by Hello

and then the finished product, as modeled by the lovely Stacey . .
Posted by Hello

Miss Cynthia also made quite a few beaded stitch markers, here’s but a few:
Posted by Hello

and I made just a few and a pair of earrings, which are so cute!
Posted by Hello

After having lunch and then hitting Joann’s in search of some Cotton-Ease (since it is being discontinued), which Stacey and Cynthia had too much fun shopping. I made it out with no Cotton-Ease(darn it all!), but a pair of collapsible scissors, which hopefully I will have enough sense to not bring on my carry-on this time!

Sunday was spent lazing about watching lots of movies, Hotel Rwanda, great movie, but oh so sad, but very life-affirming. Meet the Fockers, so-so on the humor, but was nevertheless entertaining and later on, a re-viewing of Sideways, which I just adore. And I made lots of progress on Donna and Tempting, see:

Posted by Hello

and Tempting here:
Posted by Hello

As my bf says, I was knitting most of the days, a good 10-12 hours and knitting exclusively on these two items. I was quite happy with the progress. Today, I may work on turning the heel on my almost-forgotten sock, then I can work on that one in public again.

That is all for now . .

Posted in Uncategorized | Leave a Comment »

What a Weekend

Posted by awanda on April 25, 2005

I always have great ideas that I will blog on the weekends, but the reality is, that has yet to happen. Blogging sometimes feels like a job. While I enjoy it M-F, on the weekends, I usually just don’t want to.

Anyhow, this weekend, had lots of fun with my knitting girls, Stacey, Michelle, and Cynthia. Stacey organized a beading outing where we hit Bead It! We picked out beads (which could be a dangerous hobby) and made stitch markers right there in the store. Thank goodness, because if I had to take them home, I would’ve spent a ton. Michelle made a few, but took home some beads too. Stacey actually brought some of her beads, made a couple of stitch markers and then broke out her serious bead collection and pulled out some very cute beads and made a necklace. See the layout of beads to be a symmetrical necklace:
Posted by Hello

and then the finished product, as modeled by the lovely Stacey . .
Posted by Hello

Miss Cynthia also made quite a few beaded stitch markers, here’s but a few:
Posted by Hello

and I made just a few and a pair of earrings, which are so cute!
Posted by Hello

After having lunch and then hitting Joann’s in search of some Cotton-Ease (since it is being discontinued), which Stacey and Cynthia had too much fun shopping. I made it out with no Cotton-Ease(darn it all!), but a pair of collapsible scissors, which hopefully I will have enough sense to not bring on my carry-on this time!

Sunday was spent lazing about watching lots of movies, Hotel Rwanda, great movie, but oh so sad, but very life-affirming. Meet the Fockers, so-so on the humor, but was nevertheless entertaining and later on, a re-viewing of Sideways, which I just adore. And I made lots of progress on Donna and Tempting, see:

Posted by Hello

and Tempting here:
Posted by Hello

As my bf says, I was knitting most of the days, a good 10-12 hours and knitting exclusively on these two items. I was quite happy with the progress. Today, I may work on turning the heel on my almost-forgotten sock, then I can work on that one in public again.

That is all for now . .

Posted in Uncategorized | Leave a Comment »

Progress, Little by little

Posted by awanda on April 22, 2005

The knitting is going, but man is it slow. I really like my Tempting, especially if I could quit screwing up on 2×2 ribbing! I did finally get through a host of problems I was having. Knitting while talking can easily get me off my track and then a knit lands on top of a purl and it’s all jacked. I’ve had to tink back a row or a portion of a row a few times and actually had to rip about 4 rows back to re-work a portion that was all messed up. It appears to be going smoothly now and I’ve got just about 3.25 inches done. Lots more to go. I hope to get more knitting done tonight and tomorrow and will post tomorrow, more than likely.

After several attempts at getting cast on for Donna, I finally got the 2×2 ribbing (are we sensing a pattern here?) right. Although the pattern does call for the back to cast on 114 sts, (which is not divisible by 4) and my ribbing kept coming out wonky. I finally decided to just cast on 112 sts do the 2.5 inches of ribbing and then increase on the first stockinette row by 2 sts. Last night, I got some more knitting done on Donna and am almost finished with the ribbing. Hopefully tonight I will get some stockinette done on the body.

I hope to work on the swatch for the Debbie Bliss Tennis Sweater this weekend, but we shall see. Tonight, I’m hanging out with my beau, probably going over to a friend’s house and I always bring my knitting there, so I should get a little done. Then tomorrow, I’m meeting with friends to get beads for beaded stitch markers, some lunch and some knitting. Sounds like fun and I can’t wait!

Last night I heard about some new yarn shops opening in the Denver area. There’s one called Colorful Yarns that will be located in a building adjacent to Sears at Southglenn Mall in the basement? Very odd location, but could be nice. I understand that will be opening soon.

Then a yarn store to rival Showers will be setting up shop near the Highlands Ranch Tattered Cover in that shopping center, although the owner is expanding the space, so no timetable on when it’s subject to open. I understand it will be 3000 sq. feet?! And that’s right down the road from my job! Could be lots of trouble for me. I also heard about a yarn shop opening in Parker, no further details on that one though.

After hanging out at the LYS last night after work(had to get rid of my frustration from a co-worker by knitting! Yay!). After that, I hung out with one of my friends Susan at her house where we knitted some more and I was fed some of her husband’s wonderful bread and potato and ham soup. Yum! Susan also gifted me with some beautiful Noro Menou (I’ve never heard of it before) in a gorgeous purple colorway with blues, pinks and other colors in it typical of Noro variegated yarns. The yarn is 55% wool, some cotton and silk. Just enough for a vest, I believe and I love it. Can’t wait to do something with it for next fall.

As a sidenote, do you think it’s really bad if you’re slated to go a work-related function and your coach gives your four hours off for it and it only took 1.5 hours that you didn’t go back to work early? Instead, finding a nearby book store and knitting for 1.25 hours before heading in to work? I got bonus knitting time in on Wednesday morning.

And for all the knitting I was supposed to get done on Tuesday night, well, I ended up cooking a couple of meals, although I did knit in between preparations. I think I tinked more than night than actually knitted!

Until later . .

Posted in Uncategorized | Leave a Comment »

Progress, Little by little

Posted by awanda on April 22, 2005

The knitting is going, but man is it slow. I really like my Tempting, especially if I could quit screwing up on 2×2 ribbing! I did finally get through a host of problems I was having. Knitting while talking can easily get me off my track and then a knit lands on top of a purl and it’s all jacked. I’ve had to tink back a row or a portion of a row a few times and actually had to rip about 4 rows back to re-work a portion that was all messed up. It appears to be going smoothly now and I’ve got just about 3.25 inches done. Lots more to go. I hope to get more knitting done tonight and tomorrow and will post tomorrow, more than likely.

After several attempts at getting cast on for Donna, I finally got the 2×2 ribbing (are we sensing a pattern here?) right. Although the pattern does call for the back to cast on 114 sts, (which is not divisible by 4) and my ribbing kept coming out wonky. I finally decided to just cast on 112 sts do the 2.5 inches of ribbing and then increase on the first stockinette row by 2 sts. Last night, I got some more knitting done on Donna and am almost finished with the ribbing. Hopefully tonight I will get some stockinette done on the body.

I hope to work on the swatch for the Debbie Bliss Tennis Sweater this weekend, but we shall see. Tonight, I’m hanging out with my beau, probably going over to a friend’s house and I always bring my knitting there, so I should get a little done. Then tomorrow, I’m meeting with friends to get beads for beaded stitch markers, some lunch and some knitting. Sounds like fun and I can’t wait!

Last night I heard about some new yarn shops opening in the Denver area. There’s one called Colorful Yarns that will be located in a building adjacent to Sears at Southglenn Mall in the basement? Very odd location, but could be nice. I understand that will be opening soon.

Then a yarn store to rival Showers will be setting up shop near the Highlands Ranch Tattered Cover in that shopping center, although the owner is expanding the space, so no timetable on when it’s subject to open. I understand it will be 3000 sq. feet?! And that’s right down the road from my job! Could be lots of trouble for me. I also heard about a yarn shop opening in Parker, no further details on that one though.

After hanging out at the LYS last night after work(had to get rid of my frustration from a co-worker by knitting! Yay!). After that, I hung out with one of my friends Susan at her house where we knitted some more and I was fed some of her husband’s wonderful bread and potato and ham soup. Yum! Susan also gifted me with some beautiful Noro Menou (I’ve never heard of it before) in a gorgeous purple colorway with blues, pinks and other colors in it typical of Noro variegated yarns. The yarn is 55% wool, some cotton and silk. Just enough for a vest, I believe and I love it. Can’t wait to do something with it for next fall.

As a sidenote, do you think it’s really bad if you’re slated to go a work-related function and your coach gives your four hours off for it and it only took 1.5 hours that you didn’t go back to work early? Instead, finding a nearby book store and knitting for 1.25 hours before heading in to work? I got bonus knitting time in on Wednesday morning.

And for all the knitting I was supposed to get done on Tuesday night, well, I ended up cooking a couple of meals, although I did knit in between preparations. I think I tinked more than night than actually knitted!

Until later . .

Posted in Uncategorized | Leave a Comment »

Progress, Little by little

Posted by awanda on April 22, 2005

The knitting is going, but man is it slow. I really like my Tempting, especially if I could quit screwing up on 2×2 ribbing! I did finally get through a host of problems I was having. Knitting while talking can easily get me off my track and then a knit lands on top of a purl and it’s all jacked. I’ve had to tink back a row or a portion of a row a few times and actually had to rip about 4 rows back to re-work a portion that was all messed up. It appears to be going smoothly now and I’ve got just about 3.25 inches done. Lots more to go. I hope to get more knitting done tonight and tomorrow and will post tomorrow, more than likely.

After several attempts at getting cast on for Donna, I finally got the 2×2 ribbing (are we sensing a pattern here?) right. Although the pattern does call for the back to cast on 114 sts, (which is not divisible by 4) and my ribbing kept coming out wonky. I finally decided to just cast on 112 sts do the 2.5 inches of ribbing and then increase on the first stockinette row by 2 sts. Last night, I got some more knitting done on Donna and am almost finished with the ribbing. Hopefully tonight I will get some stockinette done on the body.

I hope to work on the swatch for the Debbie Bliss Tennis Sweater this weekend, but we shall see. Tonight, I’m hanging out with my beau, probably going over to a friend’s house and I always bring my knitting there, so I should get a little done. Then tomorrow, I’m meeting with friends to get beads for beaded stitch markers, some lunch and some knitting. Sounds like fun and I can’t wait!

Last night I heard about some new yarn shops opening in the Denver area. There’s one called Colorful Yarns that will be located in a building adjacent to Sears at Southglenn Mall in the basement? Very odd location, but could be nice. I understand that will be opening soon.

Then a yarn store to rival Showers will be setting up shop near the Highlands Ranch Tattered Cover in that shopping center, although the owner is expanding the space, so no timetable on when it’s subject to open. I understand it will be 3000 sq. feet?! And that’s right down the road from my job! Could be lots of trouble for me. I also heard about a yarn shop opening in Parker, no further details on that one though.

After hanging out at the LYS last night after work(had to get rid of my frustration from a co-worker by knitting! Yay!). After that, I hung out with one of my friends Susan at her house where we knitted some more and I was fed some of her husband’s wonderful bread and potato and ham soup. Yum! Susan also gifted me with some beautiful Noro Menou (I’ve never heard of it before) in a gorgeous purple colorway with blues, pinks and other colors in it typical of Noro variegated yarns. The yarn is 55% wool, some cotton and silk. Just enough for a vest, I believe and I love it. Can’t wait to do something with it for next fall.

As a sidenote, do you think it’s really bad if you’re slated to go a work-related function and your coach gives your four hours off for it and it only took 1.5 hours that you didn’t go back to work early? Instead, finding a nearby book store and knitting for 1.25 hours before heading in to work? I got bonus knitting time in on Wednesday morning.

And for all the knitting I was supposed to get done on Tuesday night, well, I ended up cooking a couple of meals, although I did knit in between preparations. I think I tinked more than night than actually knitted!

Until later . .

Posted in Uncategorized | Leave a Comment »

Summer Knitting Lineup

Posted by awanda on April 19, 2005

I know I think I’m insane with this idea of what I will get knitted this season, but why should I let that stop me? There are so many things I want to work on this summer and I don’t know what will realistically get done, but nonetheless, here’s what I have.

1. Tempting in Katia Bufalo in a steel blue-grey color

2. Donna in a dusty grey color in Katia Beetle

3. Cabled V-Neck Tennis Sweater from this summer’s VK in Debbie Bliss Cotton Cash

Image hosted by Photobucket.com

4. Reynolds’ Jenny (variegated in a purple, green, blue colorway) for a seed stitch tank

Image hosted by Photobucket.com

5. 4 yarns for multi-color poncho, which is supposedly a quick knit, and all garter stitch

Image hosted by Photobucket.com

6. The front or back to a tank, one piece already finished from 2 years before, in Sirdar Rio

Image hosted by Photobucket.com

7. Finish the back of a V-neck tank in Katia Bonita (in a red-orange colorway) that has one piece finished and the second piece is 60-70% finished

Image hosted by Photobucket.com

Okay, now that I look at it, it’s not so-o-o-o bad, considering that 2 out of 7 are in progress already as 1 is very close to being finished, the other still needs a second piece, but still not bad at all. The others have yet to be cast on, Donna, I just cast on and will be working on the ribbing tonight. I noticed a mistake about 4 rows back on Tempting, so I will probably have to rip back, ugh!

My bf won’t be home until late tonight, so I get to watch TV and/or movies and KNIT! Yay!

Off to knit!

Posted in Uncategorized | Leave a Comment »